Sunday, July 17, 2011
A lot of Updates today!
I have been very good at keeping up with "The Landscape Guy" facebook page-not so efficient at updating the blog. Have added photos from the last month and a half or so-been pretty busy! I still have the rest of July booked up and have a good bit of work scheduled in Sept-Oct..but August looks a bit light right now if you have a project you are ready to move forward with.
Candler Park-Back Yard Sod, Tree Removal & Bed Prep
This was a neat install-really nice, small back yard area in Candler Park. I removed a huge old Red Tip Photina (remember those?) to open up some light for the turf and planting areas, then installed Palisades Zoysia as the turf. Also added amended soil to some new bed areas and tilled it in with the native soil.
Chastain Park- Dry Creek Bed Extension & Footbridge
I installed a dry creek bed at this house last summer to alleviate erosion from the back corner of the house to a "real" creek that flows thru the back yard. The homeowner liked the look and decided to extend the creek bed all the way to the driveway in front. They also wanted a way to easily cross the river stones as the walked around the house. This was accomplished with a 2' x 5' slab of Crab Orchard flagstone laid across as a footbridge. The final touch was the addition of pea gravel to improve the appearance of the section of dry creek that was visible from the front parking area.
Settles Point-Suwanee Back Yard Zoysia
Peachtree Corners/Dunwoody- Windsor Block Wall & Drainage
This client was getting his back yard washed away by all the surface water that entered his lot from the neighbor's yards in back. I installed a drainage system with around 150' of 4" ADS and 3 12" catch basins, then constructed a 100' Windsor Block Wall to corral the water and direct it into the drainage system.
Grant Park Bermuda Sod Install
Suwanee-Settles Point..Windsor Block Wall and Additional Sod
Subscribe to:
Posts (Atom)