Tuesday, March 16, 2010

Suwanee-Settles Point

This is a pretty large job that I started over the weekend with the timber planter installation and continued today with trenching and installing drain lines. This job will end up with around 500' of 4" drain line. Still to come: Catch basins, surge stone drainage pits, and more timber work-steps filled with gravel adjacent to the planter.




1 comment:

  1. This comment has been removed by a blog administrator.

    ReplyDelete