Quite a few changes in the way this job has progressed. Asphalt contractor hired by the homeowner came out to prep for installing a new driveway over the top of the old one--got delayed twice-and now the driveway has been put off until I complete the landscaping. Should be interesting to see how that turns out. Meanwhile-I have been busy removing and chipping up a lot of old plant material and today I got started on the rough grading -the plan is to be completed with my portion by Sept. 3.