Saturday, December 26, 2009

Briarlake Drainage Improvements

This was another bad drainage/wet basement project. Based on my design and suggestions from soil engineers hired by the client, a fairly extensive drainage system and dry creek bad was installed. A steep hill with it's base only 20' from the back of the house on the basement end, combined with downspout water and surface runoff was congregating large amounts of rainwater in one small area-and it was finding it's way into the basement. A main 6" line with 3 drop inlets was installed parallel to the house-a french drain was installed within a problem area and piped into the main line along with the downspouts. The grade was altered for better water flow and the collection area/swale was covered with large egg rock.

So far so good-I spoke with my client today. 2" of rain in 6 hours the day after I finished and no water in the basement! Will be doing more drainage work on the side of the house after the first of the year.







Tuesday, December 8, 2009

Peachtree Corners - Removal

After finding out just how entrenched the 20+ year old Euonymous ground cover had gotten on this job, I decided to get a backhoe out on the site yesterday to remove it. This was a good call, as I am getting most of the root systems removed along with the plants. Today I will finish up with the backhoe work and start prepping the area for new plants.

Thursday, December 3, 2009

Getting Started in Peachtree Corners

This job will entail removing the majority of existing, older plant material in the front yard and replacing it with a new design/plants. Today I started ripping out the old plants and delivered most of the plants that will be going in once the "demolition phase" is completed.


Thursday, November 19, 2009

Stone work in Oakhurst-

This little project was a bit of a departure for me. I do a good bit of dry (no mortar) stone work..walkways, walls, patios, etc...but I generally refer or hire a mason for true masonry work. In this case it was a small walkway and I felt pretty comfortable taking it on. The stairs and the under-deck patio in the photos are part of a new addition to my client's house. The builder who worked on the addition poured the concrete base for the walkway along with the patio. I simply added the slate stones as a veneer. Two day project...first day is putting down a base layer of mortar then setting the stones..after 24 hours, more mortar is applied to grout the joints. After it cures for a few days a good wash with muriatic acid will clean it up nicely.


Monday, November 16, 2009

New Addition in Oakhurst

These folks have built a nice new addition onto the back of their Oakhurst home. New deck, screen porch and interior space turned out really well. (E mail me if you would like the name of the contractor) They are getting close to time for their final inspections and I was out today to do some hand grading and replant a couple of plants that were removed prior to construction.

Design Job in Peachtree Corners

The owners of this house want to reduce the turf area and add some plants. I delivered a sketch of my ideas to them on Saturday along with a proposal in case they want me to do some/all of the planting.