Tuesday, January 12, 2010

Briarlake-Phase 2 Update





It has been an adventure trying to get my work done on this project lately. Frozen ground, snow, ice, and well below normal temps are all contributors. You learn early in this business not to get stressed about the things you have no control over, so you just keep plugging away until it gets done. Today was the scheduled stone delivery from Atlanta Landscape Materials..#57 granite gravel for the French drains and small pea gravel that will be the patio ground cover. I also worked on measuring out drain line and getting it into the trenches, setting a 9" catch basin and running a condensation line into the drainage system. Weather is predicted to improve and I hope to finish up with everything on Friday--before the rain comes;-)




No comments:

Post a Comment