Monday, April 12, 2010

Duluth-Peachtree Bluff

Started this job last Friday with Chris helping me dig the trenches for the 6" drain lines I am installing. The guys from Atlanta Landscape Materials showed up bright and early this morning with the 6" pipe, soil mix that will be used for correcting some grade issues in some beds, and 3 tons of river slick stones for use in some drainage areas and a dry creek bed. Had a pretty good day..got catch basins and a lot of the pipe in..created a nice well around one catch basin and covered it with jute mat, then stone.






No comments:

Post a Comment