This was a two day drainage project completed yesterday. First step was to build a timber wall surround for the patio in back which was backfilled to divert water away from the patio and back of the house. An addition to the existing drainage system-consisting of a new drop inlet and about 60' of sock pipe surrounded by #57 gravel-was added to alleviate standing water in the back turf area.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment