Peachtree Bluff in Duluth-

This project includes quite a bit of 6" drain pipe, some 4" pipe, catch basins, extension of a dry creek bed, stone work and new sod. I started last Friday (rain shortened)..resumed on Monday and should finish over the weekend. It's a bit crowded-the basement is being remodeled at the same time I do my work-but it's been a good group to work around. This is a nicely landscaped yard, so I am making extra efforts to disturb as little as possible as I install the drainage system.