Tuesday, October 20, 2009

Ansley Park-Grading

Finally dried out enough to get some reak work done at the Ansley Park job. Got the back rough graded today and it's ready for the addition of a layer of fill/topsoil mix in preparation for fescue seeding. In the front, the driveway was re-poured not too long ago and it was never backfilled against the edges-I took care of one side when I sodded it during the summer, today I addressed the opposite side and graded it out for proper drainage-especially on the side where the french drain was just installed.


No comments:

Post a Comment