Thursday, February 18, 2010

Dunwoody Station-Making Progress



A lot of work done in the last two days..I'm tired! Should finish with this job tommorow. Have dug trenches for and laid 200' of pipe, removed about 100' of old pipe , moved 3 yards of gravel via wheelbarrow and...have everything covered up and ready for final grade and clean up. The hardest part today was getting the older AC units raised and leveled without harming all the pipe/connections attached to them. This was necessary in order to raise the grade a bit along that side of the house. The river rock path was installed over the part of the French Drain that leads to the back gate.