Week 1 Progress-Settles Point..

Almost 600' of 4" ADS drain line laid from Tues-Fri this week. Luckily it is very wide open in places and I was able to do about 70% of the trenching with a machine-the other 30% either too tight, too muddy (got the trencher stuck 3 times on Tues) or too many big roots. I'm pleased with the progress up to this point. Tomorrow I start work on a surge stone project to help drain the rear of the property-next week will be doing timber steps.