Wednesday, August 25, 2010

Collier Rd./Atlanta-Irrigation

Got 3 (of 7) zones worth of pipe and heads installed today..ok, but I could have gotten a good bit more done if it didn't take me 3 hours to get a pipe underneath the front sidewalk. That is always a pain-and it was very painful today;-) Roots, rocks and a 12" thick sidewalk had something to do with that. Good to get that out of the way, though..and it should be pretty cut and dried tomorrow.

No comments:

Post a Comment