Thursday, September 23, 2010

Lawrenceville-Dunhill

This is a drainage project started today. All the downspouts on the house will be piped into two separate systems that will ultimately empty onto the street through the curb. In order to do this I have to get pipe under the sidewalk and to the street. I hired A1 Concrete Cutting to come out today and cut two sections of sidewalk and a section of the patio so they can be removed. When all the pipe has been installed I will re-pour the sidewalk sections and repair the patio.